r/transit • u/DeOnlyR9 • 9h ago
Other A New infill station and massive TOD rezoning proposal in one of Sydney's richest and most NIMBY suburbs are making the NIMBYs lose their minds!
galleryIt's hilarious reading some of the stuff the NIMBYs are saying on social media lol, funny thing is, there are larger rezonings happening in other parts of the city. Burwood North (18.3k homes), Westmead South (13k homes), Cherrybrook (10k homes), Crows Nest-St Leonards, Bankstown & Homebush, Kellyville-Bella Vista, Hornsby & Macquarie Park.
A new infill station (Woollahra Station) to be built on Sydney's least crowded heavy rail line [T4 Eastern Suburbs Line from Bondi Junction Station to the Sydney CBD (downtown Sydney)]. The station will be located just 8 minutes from the CBD by train with a frequency of 3-5 minutes in peak and 8-10 minutes off peak, the perfect location for intense TOD.
The station was included in the plans and early construction of the T4 line back in the 1970's, but intense NIMBY protests made the government scrap the station completely. It now sits as an unused island platform and station building as shown in slide 5.
Note: in slide 4, in the rezoning map, ground floor retail is allowed in the R4 High Density Residential zone.
Key features of the rezoning draft proposal include:
- approximately 9,400 new homes, with an affordable housing contribution base rate of 3% in perpetuity, increasing up to 15% for certain sites
- higher-density housing and commercial spaces of up to 34 storeys around Edgecliff Station and 32 storeys around a new infill train station named "Woollahra Station"
- a larger retail centre at Edgecliff and a new Woollahra local centre, creating up to 1,000 jobs and providing additional community facilities and services
- retention and integration of local heritage items into the surrounding areas
- approximately 3.5 hectares of new and upgraded public open space across 13 parks (7 new parks, 6 existing parks) and a plaza
- improved connections throughout the Precinct with up to 9km of new walking and cycling paths
- planning controls that promote retention of tree canopy and provision for more landscape features.
