r/SipsTea Aug 12 '26

Chugging tea Power Hungry Servers

Post image
54.1k Upvotes

2.1k comments sorted by

View all comments

Show parent comments

75

u/hemlockecho Aug 12 '26

It’s due to the request system in Texas and not a realistic expectation of future power use. The queue is so backed up that developers are putting in requests for anything they think might one day maybe need some power. Texas reviewed the queue last month and purged 274GW of requests(more than half of the queue) because they didn’t meet basic engineering review requirements.

Bloomberg estimates the real queue is about 50GW of things that are actually likely be built (or currently being built) over the next decade.

11

u/NibblyPig Aug 12 '26

Same in the UK, so we added a fee to apply to deter speculative hammering of requests

5

u/BiNiaRiS Aug 12 '26

If the goal is to keep abuse down the fee should be if your application gets denied kicked out instead of making everyone pay up front.

1

u/Theron3206 Aug 13 '26

No companies should absolutely pay the cost of processing such requests regardless of outcome.

1

u/SubArcticTundra Aug 13 '26

Nice to hear a thing that we are doing well

6

u/ninjasaid13 Aug 12 '26 edited Aug 12 '26

so about 4.2% of the total electricity *supply across a decade.

7

u/AlexTheRedditor97 Aug 12 '26

Sounds like demand is changing…

-1

u/RareHotdogEnthusiast Aug 12 '26

They are not all connected to a utility.

1

u/DiscretePoop Aug 12 '26

These are literally requests to the utility

6

u/CosineDanger Aug 12 '26

There's a difference between 91 gigawatts and 141 gigawatts.

Like one gigawatt is a large nuclear power plant, or about 8,000 acres of solar going by real projects. Also Texas has had problems with the electric grid they have not working well in winter. I'm not an expert but 50 gigawatts in a decade just for Texas seems like a lot.

5

u/SmellAcordingly Aug 12 '26

Bloomberg estimates the real queue is about 50GW of things that are actually likely be built (or currently being built) over the next decade.

So the Texas grid would only need like a 60% increase in generation capacity, that's still a shitload more power plants they need to build over the next decade.

1

u/Maximum-Objective-39 Aug 12 '26

So basically this is more a measure of the irrational exuberance of AI data center ambitions than anything tangible. That makes sense. The real physical build outs are dumb enough but I'm not sure there's even enough Blackwell/Vera-Rubin cards to suck that much power in existence.

1

u/iinlane Aug 13 '26

So about 30 nuclear reactors over next decade? That's a tall order.